Planning and controlling a project Content: Results from Reflection for action The project settings and objectives Project Management Project Planning.

Slides:



Advertisements
Liknende presentasjoner
DROPS simulator - konspetet •En ny tilnærming til å forhindre DROPS •En interaktive 3D simulering av riggen, som gjør det mulig for brukeren å: - utføre.
Advertisements

Endgame - Lessons from Afghanistan Torbjørn L. Knutsen.
JUDITH MOLKA-DANIELSEN NETTVERKSMØTE, ÅLESUND MAI 2011 Exploring the possibilities for learning and patient based communication.
Ordspr./ proverbs 4,18 Rettferdiges sti er som morgenens lysskjær, det vokser til det blir høylys dag. The way of the righteous is like the first gleam.
Gruppemedlemmer Gruppa består av: Magnus Strand Nekstad – s156159
The Trondheim Toll Ring System
Ledelsesinformasjonsystem
Universell utforming Kirsten Ribu HiO Evaluering av datasystemer Analyse av systemegenskaper Kirsten Ribu
Slide 2:. Forretningsmodellen forklart på engelsk og norsk
Hva ligger i begrepet om ansvarlig nanoteknologiutvikling? Roger Strand (Senter for vitenskapsteori, UiB)
Gitte Holten Ingerslev - DPU Tekst Forskerens og didaktikerens blik på mødet mellem tekst og læser.
Det tar år å innføre smidige metoder i store organisasjoner… english inside™ Smidig
Det er ganske underlig med disse sentrale salmene. Selv om du ikke er religiøs burde du lese dette.
Network- based Regional Specialisation in Child and Adolecent Psychiatry Making it Work Tromsø 23 september 2005 Olav Eldøen og Randi Nesje Myhr.
Hvordan å lykkes hos NFR? Benedicte Bull. Eksempel I: “ARMED VIOLENCE IN LATIN AMERICA: HUMANITARIAN CHALLENGES AND POLITICAL DILEMMAS” O Criminal armed.
Lynkurs Prosessregulering (Crash course process control)
EQUASS Assurance - en fordypning ”Å dele er å forbedre”. (”To share is to improve”). ERFA-konferansen i Trondheim nov
SINTEF Fiskeri og havbruk AS 1 Yngelfôr til torsk Kan vi erstatte levendefôr med nytt formulert fôr nå? Jose Rainuzzo Seniorforsker SINTEF Fiskeri og Havbruk.
Forum Produktutvikling og Design Temadag om Mekatronikk og produktutvikling Johan Rusaanes FMC Kongsberg Subsea.
Konseptuell modell Hvordan skal dette se ut ifra brukeren?
Men hva mener de som har klart det? Børge Haugset (NTNU&SINTEF)
Når ble pragmatisk slukt av Smidig ? Joachim Haagen Skeie, Smidig 2011.
1 Information search for the research protocol in IIC/IID Medical Library, 2013.
UTFORDRINGER I TVERRFAGLIGE ENDRINGSPROSESSER Dagny Stuedahl stipendiat InterMedia.
WHY WE’RE STRENGTHENING ROTARY. OBJECTIVES  Clarify what Rotary stands for, how it’s different and why people should care  Elevate awareness and understanding.
Triggere Mutasjoner i basen. Triggers Triggers are stored procedures that execute automatically when something (event) happens in the database: : data.
Ytre miljø Q4 CAKE. Information for OIM/section leaders; The presentation is to be presented in the General safety meeting together with the film on the.
Forskningsetikk og premiering av deltakere i forskning: Hva sier NESHs retningslinjer og hvilke forskningsetiske spørsmål reises? Bergen, 27, februar 2009.
Økonomiske forutsetninger Gullfaks landsbyen 2007.
Datakom høsten Datakommunikasjon høsten 2002 Forelesning nr 8, mandag 7. oktober TCP flytkontroll.
Inger Langseth Program for Lærerutdanning Knyttet til Ny bok om vurdering i alle fag, red. Dobson, Engh.
Trondheim 6. mars 2014 Mørke skyer i horisonten?.
Faktorer som innvirker på interne prosesser og ”effektivitet” i internasjonalt spredte team Hvilken innvirkning har følgende forhold på interne prosesser.
fra nachspiel ide til eksport vare
Publisering i åpne kanaler Anne Storset Institutt for mattrygghet og Infeksjonsbiologi.
Problem set 2 By Thomas and Lars PS: Choose the environment, choose many pages per sheet. Problem set 2 Exercise 11/29 Laget av: Thomas Aanensen og Lars.
1 Måling: Metoder Nivåer Validering Churchill kap. 9 Troye & Grønhaug kap. 5 Reve: Validitet i økonomisk administrativ forskning Litteratur:
 A fjord is a small bit of water between two mountains or cliffs and they are very famous in Norway.
A PROJECT WEEK 45: INTRO+ RESEARCH AND PLANNING WEEK 46: RESEARCH AND WIKI WRITING WEEK 47: NO ENGLISH WEEK 48: FINISHING TOUCHES WEEK 49: ORAL PRESENTATIONS.
Modellering og diagrammer Jesper Tørresø DAB1 E september 2007.
The Thompson Schools Improvement Project Process Improvement Training Slides (Current State Slides Only) October 2009.
Primary French Presentation 10 Colours L.I. C’est de quelle couleur?
Oppfriskning av engelskferdigheter
MikS WP1/WP2 Planned work from SINTEF.
Title: «How to use different tools and/or machines in the workshop»
Eksempel fra Nevrologisk avdeling
Relevant questions for the Reference Group
Dette er et eksempel på plassering av logoene.
CAMPAIGNING From vision to action.
Cake q4 SIKKERHETS-LEDELSE
Using nursery rhymes and songs
Welcome to an ALLIN (ALLEMED) workshop!
Design driven Innovation Programme (DIP)
Course PEF3006 Process Control Fall 2017 Sequential control
Fra idé til forskningsprosjekt Hilde Afdal & Odd Tore Kaufmann
Responsibility The purpose of the tutor reflections are to
MEDLEMSKAP OG KLUBBUTVIKLING
A review of exploration activity and results on the NCS
Course PEF3006 Process Control Fall 2018 Split-range control
Course PEF3006 Process Control Fall 2017 Split-range control
Biological quality assurance in Norway– Biological standards
Assignment 2 P3, P5, M1, M2, D1 TEAM SPORT
Kaveet Patel – Education Officer
How to evaluate effects of inspections on the quality of care?
Getting to Genuine Collaboration
What are the Chances CSCOPE Unit 08 Lesson 02.
Stat 35b: Introduction to Probability with Applications to Poker
What belongs in state storage API’s?
Jakub Kocvara, Dr. Martin Hlosta, Prof. Zdenek Zdrahal
Utskrift av presentasjonen:

Planning and controlling a project Content: Results from Reflection for action The project settings and objectives Project Management Project Planning Activity diagram How long time do we need for a given activity? - how to make a qualified guess The Gantt chart Activity schedule and how to control it Important roles in a project group

How does the expectation’s match the content of the POL-course? In fact they match very well, as it is seen from the table underneath, where it is shown which expectations that are dealt with in which lessons.

Project goal and settings

Agree on the goal, or you won’t reach it!

Be aware of your differences

Project Management Is the Management of (often unpredictable) Change Project planning – what is it? 50 % thinking ahead 25 % communication 25 % yardstick

Project Planning -What does it consist of? A model of the project, including all activities = tasks, that together constitute the complete project How can the model be used? To experiment with, without actually carrying out the timing and scheduling of activities of the project As a yardstick against which to measure progress and monitor the project As a basis for a regular review and update process, e.g. Plan the remaining part of the project

8X 10X 4X XX 2X 6X 14X Total: 70X

How do we find X ? We need 70 X There is 6 members of the group There are 35 half project day until finish What is X then ? X = 35/70 [½project day] = ½ [½project day] ? X = (35/70)x6 [½man day] = 3 [½man day]

Uge dag Fmofmtofmofmtofmotfmotfm

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2 Procesmodel 2

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2 Procesmodel 2 Kodning model 4

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2 Procesmodel 2 Kodning model 4 Test+vurdering 6

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2 Procesmodel 2 Kodning model 4 Test+vurdering 6 Teknologi..+samfund6

Uge dag Fmofmtofmofmtofmotfmotfm Problemanalyse 6 Procesanalyse 3 Kravspecifikation 3 Valg af delproces 6 Kodning delproces 2 Procesmodel 2 Kodning model 4 Test+vurdering 6 Teknologi..+samfund6 Afslutning 6

Gannt chart (Timescedule)

Trying to control the activity schedule Why has some activities taken to long time? Can we compensate for the delay by working harder? Is it possible to reorganize the work schedule If we are to cut out some activities, which one? What are the consequences of each of these choices?

Important roles in a project group Chairman Shaper Analyst Completer Librarian Secretary

Exercise: Make an activity diagram for the rest of the P0 period and use this for scheduling the time. Try also to make a first rough schedule for the P1 period (the rest of the project). Discus which roles you think is important being played in the project group, and how they should be assigned.