Statsbygg/Scandiaconsult AS

Slides:



Advertisements
Liknende presentasjoner
RFF årskonferansen 2012 Henvisningen av nasjonalt kvalifikasjonsrammeverk for livslang læring (NKR) til det europeiske kvalifikasjonsrammeverket EQF.
Advertisements

Gruppemedlemmer Gruppa består av: Magnus Strand Nekstad – s156159
Ledelsesinformasjonsystem
Network- based Regional Specialisation in Child and Adolecent Psychiatry Making it Work Tromsø 23 september 2005 Olav Eldøen og Randi Nesje Myhr.
SOSIAL KAPITAL.
Men hva mener de som har klart det? Børge Haugset (NTNU&SINTEF)
Når ble pragmatisk slukt av Smidig ? Joachim Haagen Skeie, Smidig 2011.
1 Information search for the research protocol in IIC/IID Medical Library, 2013.
UTFORDRINGER I TVERRFAGLIGE ENDRINGSPROSESSER Dagny Stuedahl stipendiat InterMedia.
1 Teleøkonomi Infomøte 3.komtek, Harald Øverby, ITEM.
Trondheim 6. mars 2014 Mørke skyer i horisonten?.
Planning and controlling a project Content: Results from Reflection for action The project settings and objectives Project Management Project Planning.
Elektronisk fakturering mellom bedrifter Oversikt over den internasjonale utviklingen Arild Haraldsen‏ Adm. Dir. NorStella Vice Chair UN/CEFACT BUREAU.
A PROJECT WEEK 45: INTRO+ RESEARCH AND PLANNING WEEK 46: RESEARCH AND WIKI WRITING WEEK 47: NO ENGLISH WEEK 48: FINISHING TOUCHES WEEK 49: ORAL PRESENTATIONS.
Økonomiske utsikter - med lavere oljepris
Modellering og diagrammer Jesper Tørresø DAB1 E september 2007.
Section 5.4 Sum and Difference Formulas These formulas will be given to you on the test.
Internprising F. Zimmer V06.
Geografiske informasjonssystemer (GIS) SGO1910 & SGO4930 Vår 2004 Foreleser: Karen O’Brien Seminarleder: Gunnar Berglund
Trender og verden rundt oss - Tanker fra bla Educause 2014 Kristian Rikvold-Jess.
Rosa parks  Mother of The Civil Rights Movement.
Norwegian Ministry of Labour and Social Affairs Engelsk mal: Startside Tips norsk mal Velg ASD mal NORSK under ”oppsett”. Social inclusion for people from.
The Thompson Schools Improvement Project Process Improvement Training Slides (Current State Slides Only) October 2009.
Lave oljepriser kan bremse utvinningen på norsk sokkel Thina Margrethe Saltvedt, Sjefanalytiker Makro/Olje (Ph. D.) Mars
ASECAP the key transport stakeholder in a changing EU transport environment Norway's contribution on the tolling roads in Europe as an ASECAP member Kallistratos.
Welcome. THE FACULTIES Faculty of Bioscience and Aquaculture Faculty of Professional Studies Faculty of Social Sciences Bodø Graduate School of Business.
SpeedUp Redusert gjennomføringstid i komplekse prosjekter innenfor bygg og anlegg. Agnar Johansen Prosjektleder.
Revisjon i Skolen.  Each Party shall ensure that:  1. the training and assessment of seafarers, as required under the Convention, are administered,
© 2016 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Engelsk mal: Startside Alternativ 1 Norwegian Ministry of Local Government and Modernisation Ms Grete Ellingsen, Deputy Minister Ministry of Local Government.
1 Klimapsykologi – hvorfor det er så vanskelig å gjøre det riktige Christian A. Klöckner.
SoMe – dei nye privatarkiva?
IPv6 in the Norwegian public sector
Find Fraud B4 it Finds You!
Digital bestillingsprosess for Armering, direkte fra modell
Levetidskostnader (LCC) og Levetidsprofitt (CLP)
Merete Asak - Styreleder ISOC Norge
Hvordan lærer vi på bransjenivå? Hva gjør Norsk olje og gass?
Torodd Jensen Norwegian Water Resources and Energy Directorate (NVE)
IFRS- sporet Regulering innen EU og internasjonalt.
The Norwegian Hydrografic Pilot
Eksempel fra Nevrologisk avdeling
Hvordan ta ut læring etter granskede hendelser?
Relevant questions for the Reference Group
Dette er et eksempel på plassering av logoene.
CAKE Q1 Ledelsesansvar Ptil’s forventninger:
Økonomiske forutsetninger
CAMPAIGNING From vision to action.
Workshop Traffic Management and Control Travel Time Information
Projections of the disease burden
The Scoutmaster guides the boy in the spirit of another brother.
Welcome to an ALLIN (ALLEMED) workshop!
Hvorfor har byggnæringen et press på seg?
Design driven Innovation Programme (DIP)
The Gains from International Trade
Project Honolulu - An Island or a new way to manage servers ????????
SRPP Guidance in Norway
STWAVE modelling, Sual - Main input data
Trends in the norwegian energy sector:
Product list and key numbers
Kick-off Good morning everybody. Nice to see so many well known faces on a big day like this. My name is Audun Pettersen and I`m Head of Tourism.
Information retrieval in medical and biological literature (SMED 8004)
Samfunnsutfordringer globalt og lokalt
A review of exploration activity and results on the NCS
Sustainability as practice
Oslo Teknopol IKS Knut Halvorsen Manager
Behind the scene Anders Hattestad ,
How to evaluate effects of inspections on the quality of care?
The Norwegian Centre for ICT in education
The courts February 2018 Court Administration.
Utskrift av presentasjonen:

Statsbygg/Scandiaconsult AS The Workplace Network The Life Cycle Profit model 10th Annual TWN Workshop Oslo, Norway, May 6-11, 2001 Statsbygg/Scandiaconsult AS

Life Cycle Profit The key to sucsess!

Why use LCP calculations? Buildings and constructions represent over 2/3 of the nations real capital. The right tool for planning and evaluating projects. To document sustainable solutions. To give credebility towards the customers and a precedence towards competitors in the buisiness. It will be demanded in future projects: Public authorities By law (Lov om offentlig anskaffelser) Statsbygg Private investors? 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model Background In autumn 1998 Statsbygg made it mandatory to perform LCP calculations in all Statsbygg projects. To ease calculating LCP, Statsbygg develops a spreadsheet model implemented in Excel 97. The model is based on the Norwegian Standard NS 3454 (LCC for buildings and civil engineering work). The calculation tool was made available to all participants in Statsbygg projects. Other landlords, both public and private, are starting to demand LCP calculations in their projects. 03.01.2019 The Life Cycle Profit Model

LCC distribution - Capital and MOM Calculating LCC is an important process, especially in projects where MOM-costs gives a major contribution to the buildings lifetime costs. 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model Annual cost theory Discounting to NPV LIfeime costs (NVP of LCC) Project cost Replacements and major maintenance Annual MOM Functional lifetime Dette er en rask innføring i årskostnadsteori, som egentlig er finansmatematikk: Vi tenker oss en brukstid for bygningen, dvs. den tid bygningen er tenkt brukt til formålet. Ved år 0 har man en investeringskostnad, i årskostnadssammenheng kalt kapitalkostnad. Videre har man en jevn FDV-kostnad over brukstiden, f.eks. renhold- og energikostnader. I tillegg kommer nødvendige utskiftninger med ujevnt intervall gjennom brukstiden. For å få disse kostnadene sammenlignbare må man diskontere kontantstrømmen til nåverdi. De årlige FDV-kostnadene summeres opp og diskonteres ned til nåverdi Det samme gjøres med utskiftningskostnadene. Til sammen utgjør nå kostnadene levetidskostnaden for bygningen. For å kunne sammenligne med årlig husleie må levetidskostnaden uttrykkes i årlige beløp eller en ”annuitet”. Annuiteten av levetidskostnaden er det vi kaller årskostnaden, og er enkelt sagt hva bygningen koster oss hvert år. Husleien bør da helst være større enn dette! Lifetime costs are calculated as annuity costs Annuity costs 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model Levels of LCP 1 2 3 Strategic level Tactical level Operational level Asset-survey Location and site Investment Main consept Dessision-making Systems Elements Qualitys Operation and maintenance The model is best suited for use on the tactical and operational level. On the strategic level a simlified method may be used. 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model The LCP model Factors Alternatives Electrical HVAC Originally developed to meet Statsbyggs need for LCP calc. Implementet as a spreadsheet tool in Excel 97 11 sheets giving you an easy-to-follow interface Construction Maintenance Operation Management Calculation Assumptions Front page 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model The Front page Gives an overveiw over key figures the building calculation assumptions annuity costs Graphics that summarizes the results 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model Assumptions All major assumptions concerning the calculation (except for maintenance data) Planners are only to enter information in this sheet. Assumptions are grouped into areas of interest 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model Maintenance 03.01.2019 The Life Cycle Profit Model

Maintenance - input section 03.01.2019 The Life Cycle Profit Model

Maintenance - distribution section 03.01.2019 The Life Cycle Profit Model

The Life Cycle Profit Model MOM - Costs Table - MOM-cost for different building categories (Multiconsult) 03.01.2019 The Life Cycle Profit Model