Undertittel Offshore Wind
2
Offshore Wind – Macro Offshore Wind – Micro ( Nacelle) Offshore Wind – Service Offshore Wind – Marked UK, Tyskland Offshore Wind - Serviceships Agenda 2
3
EU’s energi policy.. 3
4
4 Turning power into business Ca. 10.000 vindmøller vil bli installert offshore i Europa innen 2020.
5
2010 – Fornybar energi I Europa 5
6
2020 – Fornybar energi Europa 6
7
2050 – Fornybar energi Europa. 7
8
Produksjon av fornybar energi I EU Onshore/offshore 8
9
Offshore vind forsyningskjede nedbrutt i delelementer. DevelopmentTurbineFoundationPower electronicsInstallation Operation & Maintenance Design Finansiering Regelverk Bunnkartlegging (Seismikk) Generator Gearboks Propellblad Tårn Sammen- stilling Design Stål- konstruksjon Betong- konstruksjon Kabel Offshore- elektronikk Onshore- elektronikk Kabel og ”Grid” fundament Turbin Logistikk Vedlikehold (planlagt og ikke planlagt) Operasjoner Onshore anlegg Offshore anlegg Transport Oppholds- muligheter
10
10 Produsenter: Siemens, Multibrid, REpower, Vestas, GE Energy
12
12 Tittel Komponenten und Systeme/Components and Systems Turm / Tower Steighilfe/ Plattform/Aufzug/Fallschutzsystem / Ladder/Platform/Lift/Safe line systems Hauptrahmen / Main frame Rotorblätter / Rotor blades Nabe / Hub Rotorlager / Rotor bearing Mehrpunktlagerung / Multi support bearing Momentenlagerung / Torque support bearing Hauptwelle / Main shaft Hauptgetriebe / Main gearbox Kupplungen / Clutches
13
13 Sensorik / Sensor technology Ferndatenübertragung / Teleservice Schalt- und Steuerschränke / Switchboard and control cabinets Kühlsysteme/ Ventilatoren / Cooling systems/ Ventilators Hydrauliksysteme / Hydraulic systems Hydropumpen / Hydraulic pumps Hydrospeicher / Hydraulic accumulators Hydrozylinder / Hydraulic cylinders Filter / Filters Ventile / Valves
14
14 Installation/Montagetechnik/Kranbau / Installation/Assembly technology/Crane construction Verschraubungstechnik/Bolzen/Muttern / Connectors/Bolts/Nuts Korrosionsschutz / Corrosion protection Elektrotechnik/Netzintegration / Electrotechnology/Grid integration Automatisierungstechnik / Automation technology Kabel/Leitungen/Verkabelung / Cables/Lines/Cabling Energiekabel/HGÜ / Power cable/High voltage DC power transmission cable
15
15 Dichtungssysteme / Sealing systems Dichtungen / Seals Befeuerung / Lighting Messmittel / Metrology ' Sonstiges / Others
16
16 Getriebeöl / Transmission fluid Hydrauliköl / Hydraulic fluid Sonstige Schmierstoffe / Other lubricants Schmiersysteme und Komponenten / Lubrication systems and components MSR (Messen/Steuern/Regeln)-Technik / MCA (Measure, Control, Adjust) technology Zustandsüberwachungssysteme (CMS) / Condition Monitoring Systems (CMS ) Inspektion / Inspection Instandhaltung / Service & Repair Wartung / Maintenance
17
17 Service and Maintenance
18
18 Service and Maintenance
19
19 Installation
20
20 Tyske offshore – prosjekt.
21
21 Tyske Offshore prosjekt
22
22 UK Offshore – prosjekt.
23
Utbygging av en vindfarm. 23
24
Offshore Wind farm - aktiviteter 24
25
25 Wind Farm Tender – Order at Måløy Verft Offshore Windservice ApS / FOB Shipping of Bergen, order at Måløy Verft Many other vessels will be needed: - Instalation vessels – Tugs – Accommodation vessels – Guard / Standby vessels - Cable installation vessels - Survey vessels - Supply ships New Installation of 5GW means: 1000 – 1500 new turbines 700 km of new export cables Up to 20 vessels employed to install support structure. Up to 14 vessels to install turbines Up to 8 additional vessels to repair turbines Min 300 – 500 more service + support vessels Investment of nearly EUR 18 bn. Sources: EWEA, Germanischer Loyd
26
All in one solution 26
27
Cable installation vessel. 27
28
Spec. for a cable installation vessel. 28