Supplier Network Oil and Gas (LOG) Structured Arena & Efficient Tool Gardermoen, 15th November 2007 Anne Grete Svenøy Beinnes.

Slides:



Advertisements
Liknende presentasjoner
Norwegian Ministry of the Environment Engelsk mal: StartsideHUSK: krediter fotograf om det brukes bilde Tips bunntekst: For å få bort sidenummer, dato,
Advertisements

Leverandørnett Olje og Gass -nasjonalt og bransjeovergripende -prosjektorientert -ett nettverk flere prosjekter -regional forankring i flere regioner.
CIP Large Scale Pilots … og litt til Et raskt overblikk NorStella 2/5/2012 Kjell Hansteen Mobil
DESEMBERKONFERANSEN Kristian Siem SS7 New Vessels
TURNING VISIONS INTO REALITY TURNING VISIONS INTO REALITY FORSYNER VI SAMFUNNET MED DEN KOMPETANSEN VI TRENGER?
Ediel Presentasjon av Ediels Change of Supplier (CoS) prosjekt Ove Nesvik SFG / NEEG møte 4. februar 2002.
IBM Global Services JavaOne 2007 Ole André Scheie IBM GBS.
Organization and board
Régis Laurent Director of Operations, Global Knowledge Competencies include: Gold Learning Silver System Management Touch, flip and fold Håvard Haukeberg.
Gruppemedlemmer Gruppa består av: Magnus Strand Nekstad – s156159
”ECONOMIC IMPORTANCE OF ROPEWAY INSTALLATIONS AS MEANS OF CONVEYANCES SUPPORTING THE DEVELOPMENT OF WINTER TOURISM AS SHOWN BY THE EXAMPLE OF TRYSIL” –
TWN Washington Øivind Christoffersen Director General, Statsbygg (Norway) Turning customer feedback into appropriate actions and customer satisfaction.
Leverandørnett Olje og Gass
NORWEGIAN UNIVERSITY OF LIFE SCIENCES Råvarepriser på veldig lang og veldig kort sikt: Spekulasjon vs fundamentale forhold Noen facts og analyser.
The Trondheim Toll Ring System
Ledelsesinformasjonsystem
Pareto presentation 29. August
Slide 2:. Forretningsmodellen forklart på engelsk og norsk
Mobile Phone authorised Services through Near Field Communications Hans-Christian Haugli, Elin Melby, Josef Noll.
COAST GROUP 2013 Reliable – Profitable Growth Coast Structure (Family) Coast Seafood Sales / Marketing Coast USA Import / Wholesale Coast Australia.
Key takes from the CXPA breakfast meeting 19th of march 2013 Summarized by KOBRA – Full text from Post It notes available in notes 1.
Nasjonalt perspektiv Næringsperspektiv ansatte Investerings -marked: 110 mrd Driftsmarked : 55 mrd Faktisk eksport: 55 mrd 2003 → 2007:  Oljepris:
Fra ARKTRANS til et Europeisk rammeverk for intermodal transport “Common Framework” 1.
Status terminology work Daglig borerapport project meeting May 23d 2006.
‘The High North’ A Geographical-Political Concept, with Emphasis on Marine Resources Management Odd Gunnar Skagestad Deputy Director General Bergen, 28.
Network- based Regional Specialisation in Child and Adolecent Psychiatry Making it Work Tromsø 23 september 2005 Olav Eldøen og Randi Nesje Myhr.
Diploma Supplement Ting å huske Ingenting skal fjernes fra standard oppsett Informasjon om DS skal være med på institusjonens.
IFRS- sporet Regulering innen EU og internasjonalt.
3D-structure of bacterial ribsoomes. Components required for protein-synthesis in E. coli.
 Hvorfor kommuniserer vi vitenskap?  Hvordan kommuniserer vi vitenskap?
Nettverk Software Protocol Hierarchies
Virtual Societies as a Platform for Life Long Learning: Using Second Life in 3D Design Judith Molka-Danielsen Molde University.
(1) Viability performance – reporting The Hydro Way Presented by Kirsten Margrethe Hovi 2008 June 3 rd.
EQUASS Assurance - en fordypning ”Å dele er å forbedre”. (”To share is to improve”). ERFA-konferansen i Trondheim nov
: Application from 2009 resubmitted, adapted to new organization Results known September 2011 Reorganization of Notur into kjernetjenester.
Ormen Lange Transport Anskaffelsesseminar Kristiansund 05 des. 03.
Medlemsmøte i NPF Trøndelag
”Kontaktpunkt Ormen” / Petropolen, Molde 27. september 2007 Knut Wennersgaard, Ormen Lange Utbyggingen (fase 1) gjennomført på 3,5 år – hvordan.
Hva er Interaksjon Design?
1 Information search for the research protocol in IIC/IID Medical Library, 2013.
Nasjonalt kvalifikasjonsrammeverk og læringsmål i forskerutdanningen
WHY WE’RE STRENGTHENING ROTARY. OBJECTIVES  Clarify what Rotary stands for, how it’s different and why people should care  Elevate awareness and understanding.
Our drive is your performance. Hägglunds Drives 1 Our drive is your performance. Lokaliseringskriterier for Hägglunds Drives Presentasjon ved Tom Cantero.
1 Infomøte 4.KomTek Hovedprofil TØ: Teleøkonomi 20.april 2010 Harald Øverby (Steinar Andresen)
Classification: Internal Status: Draft Prosjektforslag 9 Eksperter i Team - Gullfakslandsbyen 2008 Ny plattform på Gullfaks Sør Statfjord MÅL: Øke oljeproduksjonen.
Økonomiske forutsetninger Gullfaks landsbyen 2007.
Trondheim 6. mars 2014 Mørke skyer i horisonten?.
Oslo, 25 April 2005 Styrekultur i en børsvinner Forbedring av styrearbeidet.
1 After EVISOFT in 2011 ?? Cooperating researchers for 15 years: Tore Dybå (SINTEF), Dag Sjøberg (UiO), Reidar Conradi (NTNU)
Kunnskapsdepartementet Norsk mal: Startside Tips for engelsk mal Klikk på utformingsfanen og velg DEPMAL – engelsk Eller velg DEPMAL– engelsk under ”oppsett”.
Norwegian Ministry of Labour Engelsk mal: Startside Tips norsk mal Klikk på utformingsfanen og velg først ikon; DEPMAL – norsk. Eller velg DEPMAL– norsk.
Project Fusion The power of combining resources. L y s b i l d e u t f o r m i n g : ” M / L O G O ” // V e l g b l a n t m a n g e l y s b i l d e o.
Gruppeøving 15.mars Agenda Pitching med evaluering og diskusjon: Er forretningsideene klare? Gruppearbeid og diskusjon – tema åpent Neste hjemmeoppgave.
Problem set 2 By Thomas and Lars PS: Choose the environment, choose many pages per sheet. Problem set 2 Exercise 11/29 Laget av: Thomas Aanensen og Lars.
Hva skal til for å lykkes med en internasjonal forskningsavtale? Erfaringer fra arbeidet med Japan-avtalen Svein Grandum Teknologiutsending, Tokyo
Erfaringer fra Leuven Et eldre og veletablert universitet Et område med store og FoU-intensive bedrifter ….likevel erfaringer fra samarbeid FoU – næringsliv.
Planning and controlling a project Content: Results from Reflection for action The project settings and objectives Project Management Project Planning.
The Thompson Schools Improvement Project Process Improvement Training Slides (Current State Slides Only) October 2009.
Olje- og energidepartementet | regjeringen.no/oed Norsk mal: Startside Tips for engelsk mal Klikk på utformingsfanen og velg DEPMAL – engelsk Eller velg.
Hvordan lærer vi på bransjenivå? Hva gjør Norsk olje og gass?
Design driven Innovation Programme (DIP)
Biological quality assurance in Norway– Biological standards
CCC-Bi-monthly Meeting Presentation on
Oslo Teknopol IKS Knut Halvorsen Manager
WG Joint Inter-Change Date: Authors: Name Company
Interpreting the Meaning in Queries and Target Content (SWT-3) Speakers: > Bruce Molloy, CEO, Connotate Technologies, > Sean Martin, CTO, Cambridge Semantics.
PDO Second Alert What happened?
ACCG Project Development & Approval Process
TGr Closing Report May 2005 Date: Authors: January 2002
Developing an Educational Web Application for Student Training in Geographical Information Systems (GIS) Derek Morris Jr. , Edsel Norwood , Disaiah Bennett.
Utskrift av presentasjonen:

Supplier Network Oil and Gas (LOG) Structured Arena & Efficient Tool Gardermoen, 15th November 2007 Anne Grete Svenøy Beinnes

Supplier Network Oil and Gas (LOG) Interest organization for suppliers  established 2003 (Ormen Lange project) Development project oriented Main objective  largest possible share of contracts to be awarded to LOG members  Goal achievement re. value creation as set in PDO/QA Regional bases (LOG nodes) Non-profit organization No political involvement

LOG Projects StatoilHydro  Ormen Lange development phase I Norske Shell  Ormen Lange phase I production preparation (incl. Draugen in case of joint contracts)  Ormen Lange production phase + development phase II (in negotiation) BP  Skarv-Idun development and production preparation phase StatoilHydro and Gaz de France  Gjøa development and production preparation news service on Shtokman project through established during cooperation with Norsk Hydro for Shtokman initial phase ( )

Gjøa Development Operator Cooperation Agreement with LOG  LOG Fjord Professional and open communication  Correct and early information to project web site  Information meetings & supplier/contract seminars  Main Contractors involved  Gaz de France – Gjøa production operator involved early in process

PDO for Gjøa GJØA Norwegian shareRegional share Total Investment Amountof totalAmountof Norw. NOK 23,6 bill. NOK 14,6 bill.62 %NOK 2,7 bill.19 % October 2006 Part 2 – Consequence Analysis: All amounts in 2006 valueDefinition ”regional”: Counties Sogn & Fjordane / Hordaland

Main Objective and Instruments Main Objective: Contribute that the largest possible share of contracts are awarded to LOG members. Cooperation and alliances to improve competitive position Communication of information Improve qualifications & skills Instruments Results

Qualification Activities HES seminars Achilles JQS seminars  Prequalification for projects on Norwegian and Danish continental shelves Tendering & Contract seminars Inter-member offers - upgrading of skills: Computer courses QA/QC courses Electronic interaction Counselling by LOG

Communication of Information Supplier relevant information  General information and news from O&G industry and LOG website  General project information/news  Contract awards  Contract structure  Contact persons & details Newsletters Market surveys

Communication of Information Information Strategy  Create interest in media, market and society  General upgrading of skills  Competitive climate  Open and frequent information = goodwill towards project and operator(s)

Contract Seminars Presentations by  Development Operator, Main Contractors, Produc tion Operator and LOG General topics  Contract Strategy & Structure  Time schedules  Scope of contract  Need for sub-supplies  Requirements to be satisfied  Contact persons & contact details Correct timing - all essential!Correct timing - all essential!

Contract Structure Main Contracts - Development  Estimated dates of tender/award  Contract value  Contractor & contact details  Scope and time schedule  Sub-supply requirement  Sundry information, i.e. presentations etc. Frame Agreements / Selected Make Procurement Packages  PMP (Procurement Milestone Plan)  by discipline and package number Contract Structure for Production phase

Contract Structure

Register of Members

Arena for Cooperation & Alliances Structured register/database of members  Contact details  Company presentation  Products and services according to Achilles JQS Categories Search  extensive number of various possibilities Matchmaking between bidders/ contractors and LOG members Point at “new” business opportunities based on cooperation  Complex contracts  Higher volumes / increase capacity Meeting places

Results - Ormen Lange Development

Positive Acknowledgement Norsk Hydro ASA Knut Wennersgaard, anskaffelsesdirektør Ormen Lange ”Samarbeidet med LOG har fungert utmerket og har spart spesielt anskaffelsesdelen i prosjektet for flere årsverk”. Norske Shell AS Stig Gravem, teamleder kontrakt og innkjøp (drift) ”Gjennom LOG har vi kunnet kommunisere med leverandør- markedet på en effektiv måte” Aker Kværner Verdal AS Kjell Eggen, direktør forretningsutvikling ” Medlemskapet i LOG har vært meget nyttig for oss både når det gjelder informasjon og som arena for kontakt og samarbeid”

Positive Acknowledgement (Desemberkonferansen 2005): Tom Røtjer prosjektdirektør for Ormen Lange Prosjektdirektøren ga også ros til Leverandørnett Ormen Lange (LOL) i sitt innlegg, og mente at LOL har hatt svært mye å si for at så vel lokale som nasjonale bedrifter har fått, og kan få betydelige oppdrag også i fremtiden. Røtjer understreket at samarbeidet mellom Hydro og LOL har vært det aller beste. Hydro har støttet videreføringen av LOL til Leverandørnett Olje og Gass (LOG), og LOG er også engasjert av Hydro med hensyn til leverandørkommunikasjon i den innledende fase av deres Shtokman-prosjekt.

Positive Acknowledgement Minister of Petroleum and Energy, Odd Roger Enoksen during ”JazzGass” in Molde on June 17, 2007 Om Ormen Lange prosjektet: Om Ormen Lange prosjektet: ”Før utbyggingen satte i gang var vi spente på hvilken betydning prosjektet ville få lokalt og regionalt. I dag ser vi at utbyggingen og ilandføring av Ormen Lange har ført til store lokale ringvirkninger. Dette må vi rose Hydro og de andre interessenter i Ormen Lange for å ha fått til.. Eksempel på dette ser vi i etableringen av Leverandørnettverk Ormen Lange som har videreutviklet seg til Leverandørnettverk Olje og Gass. Det er et eksempel på lokalt samarbeid mellom kommuner, fylkeskommunen og industrien som er blitt en modell for andre prosjekter i Norge.”

Postitive Acknowledgement Minister of Petroleum and Energy, Åslaug Haga, during the official opening of Ormen Lange on October 6, 2007: ”Ormen Lange har vist seg å være god distriktspolitikk. Prosjektet har stimulert lokalt næringsliv, og har fått ringvirkninger langt utenfor petroleumssektoren. Dette gjelder ikke minst for sysselsetting, og spesielt når det gjelder fremtidsrettede arbeidsplasser og næringsvirksomhet. Denne positive effekten kommer Leverandørnettverk Olje og Gass (LOG), mye takket være Leverandørnettverk Olje og Gass (LOG), som har bidratt til å gjøre lokalt næringsliv konkurransedyktig. Ormen Lange er noe hele regionen får nyte godt av, og regionen mottok ordrer for nærmere tre milliarder kroner. I tillegg har prosjektet tiltrukket seg verdifull utenlandsk kompetanse og arbeidskraft. Dette har skapt en gjensidig læringsprosess og styrket Midt-Norge som et internasjonalt senter for teknologi og innovasjon i offshoresektoren.”

LOG Strategy Extended scope – additional to large development projectsExtended scope – additional to large development projects  Production phase  Maintenance & Modifications  Increased focus on subsea segment General Cooperation (Frame Agreement) with major oil companies on the NCSGeneral Cooperation (Frame Agreement) with major oil companies on the NCS Strengthened cooperation with major Main ContractorsStrengthened cooperation with major Main Contractors  Wider need - new roles and tasks? Strategic alliance(s) to develop LOG and secure leading positionStrategic alliance(s) to develop LOG and secure leading position  in the North/Arctic/Barents area  internationalization Strengthened financial baseStrengthened financial base

Thank you for your attention! - please visit: