Om den nye rådgjevingsprosessen i ICES Vårens møter i ACOM - kvoteråd Sigurd Tjelmeland, Havforskingsinstituttet Reguleringsmøtet 16 juni 2008.

Slides:



Advertisements
Liknende presentasjoner
Norwegian Ministry of Local Government and Regional Development Engelsk mal: Startside Tips norsk mal Klikk på utformingsfanen og velg DEPMAL – norsk.
Advertisements

Norwegian Ministry of the Environment Engelsk mal: StartsideHUSK: krediter fotograf om det brukes bilde Tips bunntekst: For å få bort sidenummer, dato,
DESEMBERKONFERANSEN Kristian Siem SS7 New Vessels
IBM Global Services JavaOne 2007 Ole André Scheie IBM GBS.
Organization and board
Gruppemedlemmer Gruppa består av: Magnus Strand Nekstad – s156159
TWN Washington Øivind Christoffersen Director General, Statsbygg (Norway) Turning customer feedback into appropriate actions and customer satisfaction.
NORWEGIAN UNIVERSITY OF LIFE SCIENCES Råvarepriser på veldig lang og veldig kort sikt: Spekulasjon vs fundamentale forhold Noen facts og analyser.
GMO-situation in Norway Kathrine & Marte, Nordic-Baltic NGO meeting 2012.
The Trondheim Toll Ring System
Ledelsesinformasjonsystem
Pareto presentation 29. August
COAST GROUP 2013 Reliable – Profitable Growth Coast Structure (Family) Coast Seafood Sales / Marketing Coast USA Import / Wholesale Coast Australia.
Key takes from the CXPA breakfast meeting 19th of march 2013 Summarized by KOBRA – Full text from Post It notes available in notes 1.
Norwegian national governance of archetypes
‘The High North’ A Geographical-Political Concept, with Emphasis on Marine Resources Management Odd Gunnar Skagestad Deputy Director General Bergen, 28.
Network- based Regional Specialisation in Child and Adolecent Psychiatry Making it Work Tromsø 23 september 2005 Olav Eldøen og Randi Nesje Myhr.
Faktoranalyse Thore Egeland UiO/HIO 9 sept
International MSc in Chemical Engineering? Background –Continuing crisis in student recruitment –Desire to provide an international option, more international.
Nytte og relevans av IT-studiene: Nyansattes erfaringer 30. november 2012 Tormod Fjeldberg.
(1) Viability performance – reporting The Hydro Way Presented by Kirsten Margrethe Hovi 2008 June 3 rd.
EQUASS Assurance - en fordypning ”Å dele er å forbedre”. (”To share is to improve”). ERFA-konferansen i Trondheim nov
SINTEF Fiskeri og havbruk AS 1 Yngelfôr til torsk Kan vi erstatte levendefôr med nytt formulert fôr nå? Jose Rainuzzo Seniorforsker SINTEF Fiskeri og Havbruk.
Forum Produktutvikling og Design Temadag om Mekatronikk og produktutvikling Johan Rusaanes FMC Kongsberg Subsea.
: Application from 2009 resubmitted, adapted to new organization Results known September 2011 Reorganization of Notur into kjernetjenester.
Men hva mener de som har klart det? Børge Haugset (NTNU&SINTEF)
1 Information search for the research protocol in IIC/IID Medical Library, 2013.
Nasjonalt kvalifikasjonsrammeverk og læringsmål i forskerutdanningen
WHY WE’RE STRENGTHENING ROTARY. OBJECTIVES  Clarify what Rotary stands for, how it’s different and why people should care  Elevate awareness and understanding.
Triggere Mutasjoner i basen. Triggers Triggers are stored procedures that execute automatically when something (event) happens in the database: : data.
Web Accessibility Initative (WAI) Flere akronymer.
Forskningsetikk og premiering av deltakere i forskning: Hva sier NESHs retningslinjer og hvilke forskningsetiske spørsmål reises? Bergen, 27, februar 2009.
1 Infomøte 4.KomTek Hovedprofil TØ: Teleøkonomi 20.april 2010 Harald Øverby (Steinar Andresen)
Økonomiske forutsetninger Gullfaks landsbyen 2007.
GullfaksLandsbyen – Prosjektforslag 2007
RM – Online Thon Hotels Director of Revenue Management - Jorunn Svidal
Trondheim 6. mars 2014 Mørke skyer i horisonten?.
fra nachspiel ide til eksport vare
Netværksbaserede indsatser som integreret tilgang The grass is always greener on the other side …
Norwegian Ministry of Labour Engelsk mal: Startside Tips norsk mal Klikk på utformingsfanen og velg først ikon; DEPMAL – norsk. Eller velg DEPMAL– norsk.
Project Fusion The power of combining resources. L y s b i l d e u t f o r m i n g : ” M / L O G O ” // V e l g b l a n t m a n g e l y s b i l d e o.
Publisering i åpne kanaler Anne Storset Institutt for mattrygghet og Infeksjonsbiologi.
Problem set 2 By Thomas and Lars PS: Choose the environment, choose many pages per sheet. Problem set 2 Exercise 11/29 Laget av: Thomas Aanensen og Lars.
Planning and controlling a project Content: Results from Reflection for action The project settings and objectives Project Management Project Planning.
Engelsk mal: Startside The Ageing Society – current situation, challenges and opportunities Steinar Barstad Warszawa 25th November 2014 Specialist Director.
What is a good text? And how do we get pupils to write them?
The Thompson Schools Improvement Project Process Improvement Training Slides (Current State Slides Only) October 2009.
Welcome. THE FACULTIES Faculty of Bioscience and Aquaculture Faculty of Professional Studies Faculty of Social Sciences Bodø Graduate School of Business.
Digital læring for publikum og bibliotekansatte
Title: «How to use different tools and/or machines in the workshop»
CAMPAIGNING From vision to action.
Welcome to an ALLIN (ALLEMED) workshop!
Hvorfor har byggnæringen et press på seg?
Potential Challenges/Obstacles
Biological quality assurance in Norway– Biological standards
LO2 – Understand Computer Software
Oslo Teknopol IKS Knut Halvorsen Manager
Kaveet Patel – Education Officer
How to evaluate effects of inspections on the quality of care?
Getting to Genuine Collaboration
WG Joint Inter-Change Date: Authors: Name Company
Interpreting the Meaning in Queries and Target Content (SWT-3) Speakers: > Bruce Molloy, CEO, Connotate Technologies, > Sean Martin, CTO, Cambridge Semantics.
John F Carter Assistant Rotary Coordinator
Aboriginal Self Government and the Treaty Process
FDSN Working Group IV CTBTO Relations
TGr Closing Report May 2005 Date: Authors: January 2002
The courts February 2018 Court Administration.
Developing an Educational Web Application for Student Training in Geographical Information Systems (GIS) Derek Morris Jr. , Edsel Norwood , Disaiah Bennett.
Nottingham City Diabetes Service PLT Tuesday March 2017
Utskrift av presentasjonen:

Om den nye rådgjevingsprosessen i ICES Vårens møter i ACOM - kvoteråd Sigurd Tjelmeland, Havforskingsinstituttet Reguleringsmøtet 16 juni 2008

Den nye rådgjevingsprosessen i ICES •Ein rådgjevingskomite – ACOM Tidlegare: ACFM, ACME og ACE –ACOM representant –ACOM vararepresentant •Integrerte råd

Den nye rådgjevingeprosessen i ICES •Ekspertgrupper – retning av meir ”trykk på knappen” assessment •Dei fleste råda om våren •Reviewgrupper •Grupper for utforming av råd – ADG •ACOM web konferanse •Mogleg problem: Benchmark grupper?

Drivers of Change: In Process and Structure •Timing of fisheries advice •Calls for transparency •Linkage to science program of ICES •Workload •Quality assurance •Flexibility (beyond fast track advice) •Integration for ecosystem approach •A single voice for ICES advice

ICES Advisory Services: Key Criteria or Guiding Principles •Objectivity and integrity •Openness and transparency •Quality assurance and peer review •Integrated advice – based on an ecosystem approach •Efficiency and flexibility •National consensus

Five elements of ICES Advisory Services •Advisory Committee (ACOM): empowered to give advice on behalf of ICES, to think and act strategically, and to design processes. •Advice Drafting Groups: the major source of the advice text. Also intended to enhance integration. •Reviews: of the analytical and science input to the advice formulation. •Expert groups: to prepare scientific evidence in response to terms of reference designed to fulfil advice user’s needs. •Data compilation workshops: Where stakeholders can contribute data, including non-traditional types. May be combined with benchmark assessment workshops. Both are investments in future advice. Let’s not forget the Secretariat- more than a dozen professionals that make Advisory Services possible.

Transparency: Observers welcome •Advisory Committee •Advice Drafting Groups •Review Processes •Data workshops Kommentar: Ikkje i ekspertgrupper

ACOM Membership •20 members: each ICES member country appoint 1 member •Chair and Vice-Chair(s) of ACOM. •Chair of the Consultative Committee ex officio •Greenland and Faroe Islands as Observers •Partner Commissions have observers per MOUs

Role of the Advisory Committee Empowered by the Council to: •To think strategically about current and future advice needs •Recognize opportunities for integration and to make them happen •Design processes that are necessary to prepare and deliver advice, taking account the finite nature of human and monetary resources •Be the single voice of ICES when it comes to advice •Ultimately be responsible for the content and presentation of advice The Chair and Vice Chair(s) of ACOM are responsible for the work of ACOM. Accountable to ACOM and the Council.

Use of Modern Communication Technology •Sharepoint- provides participants in Advisory Services access to documents •Most Technical Reviews conducted by Correspondence •ACOM will adopt advice on a continuous basis (when it is ready) via video web conferences

Key Challenges •Workload- no matter how well we plan, it is likely that demands exceed the capacity of human resources. Is there the will to invest more in scientific capacity? •Costs- ICES is investing a substantial amount of money in a three year transition of advisory services. Beyond three years, costs have to be brought in line with a long term sustainable budget. •Communications- from Q&A to a dialog that helps managers ask the right questions, and helps scientists to focus on aspects of the answer that matter to managers.

ACOM webmøter våren 2007 •6 mars. OSPAR eutrophication •9,13 mai. Real-time monitoring tobis •21 april. Forvaltingsplanar makrell (EC) og sei i Nordsjøen (EC/Noreg) •22 april. EC request torskeoppdrett •6 mai. Laks •7,16 mai.Deep Sea •8 mai. NordsjøenOSPAR request sjøfugl ECOQO, EC request sjøfugl bifangst •19 mai. Bestandar i Austersjøen •22 mai. OSPAR request kjemi •23 mai. Råd til OSPAR om sjøpattedyr EcoQO i Nordsjøen, EC bifangst •27 mai. OSPAR request monitoring ?? •28 mai. OSPAR råd om påverknad frå fiskeria •6 juni. OSPAR råd om klimaendringar •2 juni. Arctic og Northwestern •9 juni. Forvaltingsplan for laks i Austersjøen •17 juni.Bestandar i Nordsjøen •18 juni.Sørlege bestandar •19 juni. Ansjos i Biskaya •23 juni.Irskesjøen •23 juni. Northern Shelf demersals, nephrops

Grunnleggjande omgrep •B lim : Når gytbestanden er mindre enn B lim, reknar ein med at ein minka gytebestand kan føre til minka rekruttering •B pa : Det er uvisse i bestandsvurderingane, og dersom ein tek sikte på ein kvote som gjer at gytebestanden er B pa, kan ein med stort sannsyn rekne med at den er større enn B lim •F lim : Den fiskedødeligheten som på sikt vil føre til ein gytebestand lik B lim •F pa : Dersom kvoten fører til ein fiskedødelighet som er F pa,kan ein med stort sannsyn rekne med at den realiserte fiskedødeligheten er mindre enn F lim

SpeciesState of the stockICES considerations in relation to single-stock exploitation boundaries ICES Advice. Tonnes or effort in 2009 SSB in relation to precautionar y limits F in relation to precautionar y limits F in relation to high long- term yield F in relation to high long- term target In relation to agreed management plan In relation to precautionary limits In relation to target reference points / high long term yield Northeast Arctic cod Full reproductive capacity Harvested sustainably Appropriate tadvice according to management plan F is at Fpa t Norwegian Coastal cod Unknown Zero catch. Develop recovery plan Zero catch and develop recovery plan Northeast Arctic haddock Full reproductive capacity Harvested sustainably Appropriate tadvice according to management plan F is within the range of F 0.1 and Fpa t Northeast Arctic saithe Full reproductive capacity Harvested sustainably AppropriateBelow target tadvice according to management plan F is lower than Fpa t Greenland halibut No new assessmentSame advice as last year< t Sebastes mentella No new assessmentSame advice as last yearProtect juveniles, no directed trawl fisheries and low bycatch limits Sebastes marinus No new assessmentSame advice as last yearNo directed fisheries and low bycatch limits ShrimpAvailable in November CapAvailable in October

Nordaust arktisk forvaltingsplanar Spinoff: Langtidsutbytte torsk hyse sei BasisTeste mot Blim ved langtidssimulering BlimKnekkpunkt i rekrutteringa FFpa = 0.40 når SSB > Bpa Reduksjon av FTil null når SSB < Bpa Tidsperiode3 år, middel av fangst etter regel Stabilitet10% når SSB > Bpa Torsk BasisTeste mot Blim ved langtidssimulering BlimVurdering frå gytebestand-rekrutterings plott FFpa = 0.35 når SSB > Bpa Reduksjon av FTil null når SSB < Bpa Tidsperiode1 år Stabilitet25% når SSB > Bpa Hyse Sei BasisTeste mot Blim ved langtidssimulering BlimKnekkpunkt i rekrutteringa FFpa = 0.35 når SSB > Bpa Reduksjon av FTil null når SSB < Bpa Tidsperiode3 år, middel av fangst etter regel Stabilitet15% når SSB > Bpa

Nordaust arktisk torsk •Haustingsregelen, tonn •10%-regelen set inn, dersom ikkje: tonn •Basert på norske IUU tal (SPALY) –Norske utrekningar IUU 2007: –Russiske utrekningar IUU 2007: 8757 –Russiske utrekningar gav ein lågare bestand, men også då avgrensa av 10%-regelen •Økosystem element –Kannibalisme –Framskriving av rekruttering

Nordaust arktisk torsk

Nordaust arktisk hyse •1-års forvaltingsplan no vurdert å vere føre-var, sjølv med implementeringsfeil (meir vekt på B lim (= tonn)i høve til F lim ) •Assessmentet godkjent •Bestandsdata reviderte i 2006, referansepunkt ikkje endra •Haustingsregelen, tonn •25%-regelen set inn, dersom ikkje: tonn •Basert på norske IUU tal –Norske utrekningar IUU 2007: tonn –Russiske utrekningar IUU 2007: 3100 tonn –Liten skilnad i estimatet •Økosystem element –Beiting frå torsk

Nordaust arktisk hyse

Nordaust arktisk sei •Forvaltingsplanen testa i 2007 og funne å vere føre-var •Assessmentet godkjent •Haustingsregelen, tonn

Nordaust arktisk sei

Kysttorsk •Inga vesentleg bestandsendring •Det er ikkje definert forvaltingsmål •Det er ikkje definert referansepunkt •Ingen fangst i 2009 •Ein gjenoppbyggingsplan bør utviklast og implementerast •Fangsten underestimert på grunn av fritidsfiske

Kysttorsk Auke i biomasse på grunn av auke i individuell vekt

Blåkveite i område I og II •Nye data endrar ikkje oppfatninga av bestanden •Same råd som for 2007 og 2008, fangst mindre enn tonn

Vanleg uer •Inga endring i sitasjonen •Ikkje direkte fiske

Snabeluer •Inga endring i sitasjonen •Ikkje direkte fiske

Brosme •CPUE-indeksen ikkje opparbeidd for 2007 •5000 tonn, som i fjor

Lange •CPUE-indeksen ikkje opparbeidd for 2007 •6000 tonn, som i fjor

Vassild •Låg produktivitet, låg beskatningsrate •Fisket bør ikkje aukast før det kan visast at det er berekraftig

Lodde ved Island / Jan Mayen •Ingen førebels kvote