2
General Floating or bottom fixed Living quarters, storage, drilling, processes etc Fundament + topside Bilder av våre eksempler: jacket, jack up, GBS, TLP, flytere + topside
3
Installation Production Prepared for transport Load out, dry tow Transferred to floating condition, wet tow Tow to field Design of towing fleet Installation Transfer to “installation mode” Positioning (horizontal and vertical) Hook-up to mooring, set- down on sea floor etc. Installation of topside
4
Jacket fabrication Bilder
5
Load-out Bilder
6
Load-out Bilder
8
Transportation Bilder
14
Some challenges during launch and upending Position and size of temporary buoyancy tanks Maximum forces at rocker beam Maximum depth during launch Structural loads due to hydrostatic pressure Bottom clearance Floating condition after launch Access to lifting arrangement Upending Structural loads Crane load Bottom clearances Proper upright position Ballasting of side legs
15
Jacket installation: crane lift
16
Jacket installation,- final phases Jacket in upright position? Ballast in jacket legs Transit to set-down point. Several 100 meters Further ballasting and lowering by crane Landing Release crane On- bottom stability in temporary phase? Piling
17
Topside Bilder av Loadout og floatover Skidding or trailers
18
Topside
19
Floatover
20
Topside Bilde av Dry tow-out
23
GBS Bilder at GBS utslep og installasjon
24
Jack- up
25
Jack-up footings
27
TLP Platform with buoyant sub-structur Vertical strong and stiff mooring, high pretension Vertical motion arrested Large horizontal motions
28
TLP installation Lowering and piling of fundaments Tendon installation Tow-out of platform Hook-up and pretensioning
29
Types of floaters
30
Installation of mooring system Bilder mooring inst
31
Tow-out and installation of floater Bilder
34
Sleping av Semi,- oppgavegjennomgåelse Vi fikk altså vite grovdimensjonene på en semi, samt slepefart og slepekraft. Vi skulle avgjøre: er dette rimelig. Frontal area: S1=2*20*40=1600 S2=10*60=600 Kraft: 0.5* *S*Cd*V*V Ca 2 500 tonn