ORMEN LANGE ONSHORE FACILITIES THE MEG REGENERATION AND CONDENSATE EXPORT SYSTEM PROJECT A PROJECT PRESENTATION BY VETCO.

Slides:



Advertisements
Liknende presentasjoner
® IBM Software Group © 2004 IBM Corporation Kunnskapsforvaltning eller Ustrukturert Læring? Dag Oliver, IBM Software Group Norge.
Advertisements

Ormen Lange prosjektet – operatørens samarbeid med LOG og resultater.
Subsea Production System for Gjøa
MedieTrender – med fokus på sosiale medier EnergiNorges Markedskonferanse Knut-Arne Futsæter
• De første månedene: – lesere • Fra november 2012: fra besøk pr måned.
ProjectHelp vs. TimeEase
Leverandørseminar Harald Anthonsen
DESEMBERKONFERANSEN Kristian Siem SS7 New Vessels
IBM Global Services JavaOne 2007 Ole André Scheie IBM GBS.
Organization and board
”ECONOMIC IMPORTANCE OF ROPEWAY INSTALLATIONS AS MEANS OF CONVEYANCES SUPPORTING THE DEVELOPMENT OF WINTER TOURISM AS SHOWN BY THE EXAMPLE OF TRYSIL” –
Teknologiutvikling, Verdikjeder og Innovasjon noen tanker om ‘memespleising’ i olje og gass industrien Tore Karlsson.
Siri Eldevik Håberg MD PhD I4C, Lyon, November 12, 2012.
Bruk av MS Project 2003 Server til Målrettet prosjekt styring Ulrika Johansson, Project Manager -DNV IT Solution.
The Trondheim Toll Ring System
Møte 6. februar 2014 Birte Holmedal GreenDoor® Logistics
Pareto presentation 29. August
Pensjonistforeningen Trondheim Årsmøte
COAST GROUP 2013 Reliable – Profitable Growth Coast Structure (Family) Coast Seafood Sales / Marketing Coast USA Import / Wholesale Coast Australia.
Key takes from the CXPA breakfast meeting 19th of march 2013 Summarized by KOBRA – Full text from Post It notes available in notes 1.
Skipshopphugging – gjeldende og fremtidig internasjonalt rammeverk Sveinung Oftedal seniorrådgiver.
Status terminology work Daglig borerapport project meeting May 23d 2006.
IFRS- sporet Regulering innen EU og internasjonalt.
Classification: Internal Status: Draft Prosjektforslag 3 Eksperter i Team - Gullfakslandsbyen 2008 Bruk av liner på GFHF MÅL: Øke utvinningen med 10% ved.
Porteføljeledelse i Hydro O&E
International MSc in Chemical Engineering? Background –Continuing crisis in student recruitment –Desire to provide an international option, more international.
Energi i vind og Havstrøm TEP 4175
Nytte og relevans av IT-studiene: Nyansattes erfaringer 30. november 2012 Tormod Fjeldberg.
Yara – kunnskap for et bærekraftig landbruk. Date: Page: 2 Yara business struktur Nedstrøms OppstrømsIndustriell.
SFI – Senter for Forskningsdrevet Innovasjon Centre for research based innovation Vitenskaplig kvalitet Forskerutdanning –Master –PhD –Postdoc Innovasjon.
Ormen Lange Transport Anskaffelsesseminar Kristiansund 05 des. 03.
SHELL SEMINAR RICA SEILET Linjebygg Offshore AS (LBO)
Skarv / Idun Drifts Forberedelse
”Kontaktpunkt Ormen” / Petropolen, Molde 27. september 2007 Knut Wennersgaard, Ormen Lange Utbyggingen (fase 1) gjennomført på 3,5 år – hvordan.
© Process Industriee /07/2014 Insert image here Oil & Gas Industries Division SRU EOP Olav Slupphaug.
The Rotary Foundation of Rotary International Distriktssamlingen 2009.
Our drive is your performance. Hägglunds Drives 1 Our drive is your performance. Lokaliseringskriterier for Hägglunds Drives Presentasjon ved Tom Cantero.
J. Amdahl,, NTNU Dept, Marine Technology Beregning av ulykkeslaster for offshore stålkonstruksjoner – NFS Accidental Explosions Design criteria.
Bærekraft i Agder og Telemark. Definisjoner og dialog Stina Torjesen, UiA.
Figur 1 Behov. Figur 2 Behov Figur 3 Prioritering/ressursinnsats.
Figur 1 Behov. Figur 2 Behov Figur 3 Behov Figur 4 Behov.
Figur 1 Behov. Figur 2 Behov Figur 3 Prioritering/ressursinnsats.
Classification: Internal Status: Draft Prosjektforslag 9 Eksperter i Team - Gullfakslandsbyen 2008 Ny plattform på Gullfaks Sør Statfjord MÅL: Øke oljeproduksjonen.
Økonomiske forutsetninger Gullfaks landsbyen 2007.
Oslo, 25 April 2005 Styrekultur i en børsvinner Forbedring av styrearbeidet.
1 After EVISOFT in 2011 ?? Cooperating researchers for 15 years: Tore Dybå (SINTEF), Dag Sjøberg (UiO), Reidar Conradi (NTNU)
Sikkerhetsarbeid i den nordiske fiskeflåten -Et arrangement under Norges formannskap i Nordisk Ministerråd 2012 Tromsø Trends of the fatal.
Project Fusion The power of combining resources. L y s b i l d e u t f o r m i n g : ” M / L O G O ” // V e l g b l a n t m a n g e l y s b i l d e o.
1 Renewable energy. 2 Renewable energy sources Sun Wind Hydro Wave Tidal Osmosis Geo thermal Biofuel.
1 Prosjektplan Work Packages Project Management WP1: Demand Assessment WP2: Supply Assessment WP3: Product Design & Comm. Definition WP4: Integration of.
Engelsk mal: Startside The Ageing Society – current situation, challenges and opportunities Steinar Barstad Warszawa 25th November 2014 Specialist Director.
Hanøytangen– “En varm potet i et endret marked”
Maritime services in our region -
Presentasjon av Skude Industri AS
Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway Tel: Fax: Cambi presentasjon Bioenergi.
Presentasjon av Skude Industri AS. Historie & Eierstruktur Skude Industri AS ble etablert i Skudeneshavn, som mekanisk bedrift for skipsfartsreparasjoner.
Radio listening in Norway
GNP per Capita in 1971 Index USA = 100
Course PEF3006 Process Control Fall 2017 Plant-wide control
Bioenergi på Kongsgården
Design driven Innovation Programme (DIP)
Generelt om søknadene til PSA Award
Course PEF3006 Process Control Fall 2018 Plant-wide control
Population Diversity & Distribution
IWCF Well Intervention
SYSTEM AND CONTINGENCY
Region4 Conference Administrator’s Report on DIMDIM
Utskrift av presentasjonen:

ORMEN LANGE ONSHORE FACILITIES THE MEG REGENERATION AND CONDENSATE EXPORT SYSTEM PROJECT A PROJECT PRESENTATION BY VETCO

VETCO INTERNATIONAL COMPANY STRUCTURE Vetco International Ltd. Vetco Gray Inc. Vetco Aibel AS Drilling & Production Equipment Subsea Systems Process and Facilities Maintenance, Modification and Operation Wellheads & Tree Systems Connectio Manifolds Template s Interventio n Systems Downhole Subsea Processing Flow Assurance Riser Systems Flowlines & Umbilicals Control Connection Templates Intervention Revenues 2002: BUSD 1.7

VETCO INTERNATIONAL GLOBAL LOCATIONS Vetco International has more than 60 locations around the world USA Venezuela Brazil Nigeria Scotland England France Italy Netherlands Azerbaijan Saudi Arabia Qatar  Singapore Malaysia Indonesia China Norway Congo Denmark Australia Egypt Canada Alaska Argentina Abu Dhabi Kazakhstan Angola Algeria Iran Mexico  Eq. Guinea Thailand  Vetco Aibel Employees: 5 000 Headquarters: Billingstad Norway  Engineering Center Manufacturing Center Sales/Service/Project Office Vetco Gray Employees: 4000 Headquarters: Houston Texas

VETCO AIBEL CAPABILITIES Wide experience and strong capabilities in executing EPC(I) projects and Maintenance, Modification and Operation services Scope of Supply: Surface services, products and facilities, and subsea production systems FEED New Build M&M Subsea Operations Abandonment Åsgard platform Kvitebjørn Phillips Ekofisk Troll Pilot Sendje Berge Ekofisk 2/4S

VETCO AIBEL - FACTS AND FIGURES Established in 17 countries Approximately 5,000 employees in Norway 3,500 Annual revenues of approx. 700 MUSD Headquarters: Norway Other locations: Angola, Australia, Brazil, Congo, Denmark, Egypt, Equatorial Guinea, Italy, Iran, Kazakhstan, Mauritania, Nigeria, Papua New Guinea, Thailand, UK, USA

VETCO AIBEL’S ARBEIDSOMFANG ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION VETCO AIBEL’S ARBEIDSOMFANG Administration Complex Camp Main Intake and Power Distribution Process- and Utilities MEG Tank Farm & Process Area Flare Construction Jetty Slug Catchers Condensate Product Jetty Condensate Rock Caverns Pipelines

VETCO AIBEL GJENNOMFØRER TO DELPROSJEKTER I NYHAMNA: ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION VETCO AIBEL GJENNOMFØRER TO DELPROSJEKTER I NYHAMNA: MEG REGENRATION SYSTEM (EPC3) CONDENSATE EXPORT SYSTEM (EPC2) GJENNOMFØRES SOM ET PROSJEKT MED EN FELLES PROSJEKTORGANISASJON PROSJEKTET OMFATTER PROSJEKTERING, ANSKAFFELSE, BYGGING OG INSTALLASJON FREM TIL MEKANISK FERDIGSTILLELSE KONTRAKTSPRIS: CA. 1.200 MILL. NOK

HOVEDELEMENTENE I MEG REGENERATION SYSTEMET: ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION HOVEDELEMENTENE I MEG REGENERATION SYSTEMET: Tre MEG regenererings prosess-moduler Diverse prosessutstyr inkl. anlegg for kjemikalie-injeksjon, sentrifugeanlegg, flash-tank, setling-tanker, etc. Pumpeanlegg for offshore injeksjon av MEG MEG tank anlegg inkl. fire tanker (ca. ø=20m, h=20m) Substasjon nr. S100 Alt fast installert sikkerhets/beredskapsutstyr Alle rørføringer, kabler etc over og i bakken innenfor “battery limit” som binder de nevnte anleggsdelene sammen og som knytter disse til anlegget utenfor MEG Regen-området. Tilhørende rørbroer, strukturer, fundamenter, grøfter, kulverter ol. Ferdigstillelse av grovplanert tomt: veier, tilkomst-og betjenings-områder samt annen tomteopparbeidelse.

MEG REGENERATION SYSTEM ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION MEG STORAGE TANKS SUBSTATION S100 MEG EXP. PUMPS MEG REGENE- RATION SKIDS PROCESS & UTILITIES MEG REGENERATION SYSTEM

HOVEDELEMENTENE I CONDENSATE EXPORT SYSTEMET ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION HOVEDELEMENTENE I CONDENSATE EXPORT SYSTEMET Utrustning av Produkt-caverne og Off-spec. condensate caverne Produktkai med full utrustning Målestasjon for kondensat Gjenvinningsanlegg for VOC fra tankskip Substasjon nr. S110 Alt fast installert sikkerhets/beredskapsutstyr Alle rørføringer, kabler etc over og i bakken innenfor “battery limit” som binder de nevnte anleggsdelene sammen og som knytter disse til anlegget utenfor Condex-området Tilhørende rørbroer, strukturer, fundamenter, grøfter, kulverter ol. Ferdigstillelse av grovplanert tomt: veier, tilkomst-og betjenings-områder samt annen tomteopparbeidelse

CONDENSATE EXPORT SYSTEM ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION CONDENSATE EXPORT SYSTEM VOC PROCESSING UNIT CAVERN TOP & METERING PRODUCT JETTY SUBSTATION S100 CONDENSATE STORAGE CAVERNS

ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION PRODUCT JETTY

HOVED-UNDERLEVERANDØRER ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION HOVED-UNDERLEVERANDØRER NORCONSULT CIVIL ENGINEERING AF SPESIALPROSJEKT CIVIL CONSTRUCTION PROSERNAT, Fr. MEG REGENERATION SKIDS SKANDINAVISK INDUSTRI SERVICE, Dn. MEG TANK ANLEGG VETCO GAS TECHNOLOGY VOC UNIT

PLANLAGTE TIMEVERK TOTAL Engineering & Procurement 219 ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION PLANLAGTE TIMEVERK TOTAL 1000 HRS Engineering & Procurement 219 Construction (Direct man-hours) 542 Other 97 858

ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION PROSJEKTPLAN

ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION TIMEVERK OG FREMDRIFT

ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION BEMANNING

At HMS-arbeidet skal være integrert i våre øvrige aktiviteter ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION Vetco Aibel’s HMS mål: Zero Lost Time Incidents , Zero injuries No occupational illness and personnel exposure to hazardous materials. Reported near misses > 5 reports per man-year (Construction) No material and property damages/ losses Tiltak for å nå målene; At HMS-arbeidet skal være integrert i våre øvrige aktiviteter At prosjektledelsen skal være profilert og synlig i HMS-arbeidet Fokus på engasjement fra arbeidsleder-nivået Kampanjer, opplæring, informasjon, verifikasjoner, inspeksjoner

Fokus på underleverendørers HMS arbeid RUH rapportering ORMEN LANGE ONSHORE FACILITIES MEG REGENERATION AND CONDENSATE EXPORT SYSTEMS PROJECT PROJECT PRESENTATION Fokus på underleverendørers HMS arbeid RUH rapportering HSE Status pr 2005 02