Brønnkontrollhendelse Troll G-4 BY1H

Liknende presentasjoner


Presentasjon om: "Brønnkontrollhendelse Troll G-4 BY1H"— Utskrift av presentasjonen:

1 Brønnkontrollhendelse Troll G-4 BY1H
Sikkerhetsforums årskonferanse, Petter Kostøl, Statoil Classification: Internal © Statoil ASA 2 februar 2017

2 Annular closed and sealed Pressure testing Exposed control lines
Opened GLV and FCVs Gas from reservoir entered well and drained out the liquid Gas came out of well, partially emptying liquid in marine riser Gas in tubing and partially in annulus Classification: Internal © Statoil ASA 2 februar 2017

3 Hovedårsaker Beslutning om å basere primærbarrieren på ventiler som kunne åpnes (cycle) i stedet for mekanisk plugg Utilsiktet cycling (åpning) av barriereventilene Frigjøring av produksjonsrørhenger uten å ha mulighet til å kontrollere om det var trykk under, og uten å stenge ringromssikringen i BOP Planen for å trekke produksjonsrørhenger tok ikke hensyn til muligheten for at den dype barrieren kunne svikte, dvs. operasjonen ble utført uten den nødvendige uavhengighet mellom barrierene Driftsprosedyren ble endret kvelden før til å frigjøre produksjonsrøropphenget uten å stenge ringromsventilen i BOP Classification: Internal © Statoil ASA 2 februar 2017

4 Viktigste forbedringsområder fra Statoil gransking :
Endring- og risiko-styring i boreprosjekter Brønnkontrollkompetanse  Prosess ift unntakstyring (DISP prosess) Robustgjøring av barrierer Deling av erfaringer/kontinuerlig læring  Classification: Internal © Statoil ASA 2 februar 2017

5 Tiltak gjort etter hendelsen
For P&A-operasjoner i brønner med VXT/HXT vil ikke innstrømmingskontroll-/gassløftventiler bli brukt som barriere-elementer i Statoil Hvis det ikke er mulig å kontrollere om det er trykk under produksjonsrøroppheng/plugger, skal det alltid gjøres tiltak for å unngå utstrømming av hydrokarboner (vanligvis stengt BOP). Ledermøter med alle leverandører for å gjennomgå brønnkontrollhendelser og etablere tiltaksplan for Forbedring av Brønnkontroll. Forsterke brønnkontrollforventninger til supervisors og planleggingsteam i Boring & Brønn, forsterke WCR-oppfølging på alle nivåer Fokus på brønnkontroll i påsevirksomhet, riggvurdering og lederbesøk offshore. Dele lærdom/erfaringer fra hendelse med bransjen Classification: Internal © Statoil ASA 2 februar 2017

6 Stepping up Well control in D&W projects
WCR - identified and measures addressed * WCR - awareness among all relevant personnel QC of swab calculations Risk assessment in planning phase Handling of risks in execution phase WCR – Morning meetings , DOP arenas, Tool Box talks WCR - always to be reviewed as part of MOC** Be open to weak signals Volume control Circulate bottoms up if doubt about downhole situation Listen to other’s opinions Worst case approach until else is proven Indication of well control incident Updated Kill sheet Onshore support available on short notice – Emergency team Clarify Roles and responsibilities Handling of influx/kick situation Well control certification (IWCF) & Well integrity seminars Periodic exercises (Drills) Table tops and simulator training (MPD, RAS etc) Experience sharing and learning (One pagers/Safety flash) Competence and training * WCR – Well control Risks ** Management of change Classification: Internal © Statoil ASA 2 februar 2017

7 Ytterligere læringspunkter fra G-4-hendelsen
Kontroll av alle brønn barriere-elementer til enhver tid Risikovurdere ved endringer av planer Offshore kvalitetsjekk av planer og prosedyrer Verifisere anbefalinger fra offshore spesialister Sikre BORER sitt mandat til å ta aksjon Tennkildekontroll Classification: Internal © Statoil ASA 2 februar 2017

8 Presenters name/title, etc
Presentation title Presenters name/title, etc © Statoil ASA This presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, are owned by Statoil. Copyright to all material including, but not limited to, written material, photographs, drawings, images, tables and data remains the property of Statoil. All rights reserved. Any other kind of use, reproduction, translation, adaption, arrangement, any other alteration, distribution or storage of this presentation, in whole or in part, without the prior written permission of Statoil is prohibited. The information contained in this presentation may not be accurate, up to date or applicable to the circumstances of any particular case, despite our efforts. Statoil cannot accept any liability for any inaccuracies or omissions.