1 Skarv – Idun Leverandørseminar 6. juni Sandnessjøen

2 2 Agenda BP og HMS presentasjon, Øystein Johnsrud BP (30min) Skarv Idun Oppdatering, Kjell Magne Madsen BP – (30 min) LOG/LOG Nord – Leverandørnettverk, Eirik Hansen (LOG Nord) – (20 min) Rørtjenester i.f.m. Boring, Håkon Haaland (Sumitomo) – (30 min) Stigerør, Harald Bø(Technip) – (30 min) Borerig, Jan B Fossen/Ole Andreas Holm (Awilco) – (30 min)

3 3 Development Concept – FPSO FPSO Production Facility Design Life 25 years Accommodation100 POB (single cabins) Oil Production Capacity85,000 bbls/d Gas Plant Capacity670 mmscfd Gas Export capacity650 mmscfd Gas Injection Capacity250 mmscf/d Topsides16,500 Te Hull35,000 Te Turret / Moorings9,000 Te Subsea Base Case: 16 wells, 5 subsea templates, flexible risers Export Oil via tandem stern shuttle tanker export Gas via new 80 Km 26” spur pipeline to ÅTS pipeline Resources Base Case (Skarv, Tilje, Idun) 425 mmboe Schedule PDO Submission - End 2Q 2007 First Production - 3Q 2011

4 4 Project Schedule

5 5 Skarv FPSO 1

6 6 P300 Gas Treatment & Gas Injection P500 Separation, Produced Water Treatment P600 Methanol & Chemical Injection P200 Export compressors Bulk Loading FKO Drums U800 Power Generation P400 1st/2nd Stage Recompression 3rd Stage Recompression Fuel Gas, T750 Turret, Turntable TAS Skarv FPSO 2

7 7 P T P T P T P T U T 4 Modules 23.2 m x 46.1 m x 9 m high 1 Module 28.8 m x 50 m x 9 m high P T 1 Modules 15.2 m x 46.1 m x 9 m high Skarv FPSO 3 Turret 2100 T Turntable 2500 T Swivel 375 T TAS 1000 T

8 8 Turret

9 9 SURF Overview Key Design Features Template Architecture (5 templates) Drill Thro’ Horizontal Trees (16 wells) Manifold Flexibility −LP/HP headers −GI/GP switch over −Multiphase metering Rigid Spools CRA Production Flowline Materials Individual Flowlines (~44 km) −Bundle Option Gas lift supply in umbilicals Wet Insulation DEH for Idun Flexible Risers (10 inc export) Static Umbilicals (~21 km) Dynamic Umbilicals (2 control + 1 power)

10 10 Overall Schematic

11 11 SPS Scope of Supply

12 12 Ongoing Design Activities On-bottom stability analysis Expansion & buckling analysis Cathodic protection design Tie-in & spool design Material data sheets Spool design optimised L-shaped spools to simplify installation ERB Tie-in Layout ERB Piping Layout PLEM Tie-in Layout Export Pipeline System

13 13 Skarv Idun en mega-utbygging i Norskehavet PUD inn i slutten av juni 2007 PUD forventet godkjent i desember 2007 Produksjonsstart august 2011 Invisteringer på omkring 30 milliarder kroner

14 14 FPSO (tall i million kroner)

15 15 Subsea (tall i million kroner)

16 16 Materialer og utstyr (tall i million kroner)

17 17 Boring (tall i million kroner)

18 18 Rockdumping - tilbyderliste Boskalis Offshore Rosmolenweg 20 P.O. Box AA Papendrecht The Netherlands * Mr. S.G.M. van Bemmelen, Proposals Manager: * Mr. B.J.F. de Waard, Proposals Engineer: Tideway BV Topaasstraat 64 P.: Box GB Breda The Netherlands *Serge Parera *Saskia Albers Van Oord Offshore bv 2 Jan Blankenweg 4207 HN Gorinchem P.O. Box AL Gorinchem The Netherlands Rene van Kessel - Regional Manager - Subsea Rock Installation - address Steve de Koning - Commercial Manager - Subsea Rock Installation - address

19 Valhall Oppdatering 6. juni Sandnessjøen

20 20 Valhall, nytt feltsenter New Facility Design Life - 40 years Hotel single bed cabins Oil production capacity mbopd Gas handling capacity - 5 million Sm3/day Total liquid capacity mbpd (oil & water) Weight topside + hotel ~ tne Weight jacket ~ tne Power from Shore km HVDC cable Oil Export - Future offshore loading/EOR Project Sanctioned Q Platform start up

21 21 Valhall kontrakter Prosjektering og innkjøp – Mustang (Houston)/Fabricom (Stavanger) Prosjektering og utstyrsleveranse, kraftforsyning fra land, ABB (Oslo/Sverige) Strømkabel design, fabrikasjon og installasjon, Nexans Norge Fabrikasjon av dekk + oppkobling av moduler, Heerema Holland Fabrikasjon av boligkvarter og ”kraftmodul”, SLP UK Stålunderstell, Aker Verdal Prefabrikasjon og offshore modifikasjoner, Aker Kvaerner Offshore Partner Stavanger Undervannsmodifikasjoner, Subsea 7, Stavanger Kontrollsystem, ABB Sandnes/Oslo

22 22 Hvordan bli en leverandør til BP Norge Identifiser og etabler kontakt med kunden (sluttbruker i BP) Registrerer firmaet i Achilles som godkjent leverandør med oppdaterte opplysninger − HMS - Egenvurdering (NORSOK S-006) − Produkter/tjenester Oppfyll minimumskrav til HMS. − Systemer og prosesser for HMS & K − HMS Resulter HMS spiller en viktig rolle i tildelingen av oppdrag! Vi finner dere ikke hvis kompetansen deres ikke er registrert!

23 23 Hva vi ser etter hos leverandører HMS ledelse. Oversikt over dokumentert kompetanse − De rette produktene/tjenestene − Life cycle cost − Evne til gjennomføring − Ability to deliver vendor data Ønskede egenskaper − Bere bruk av teknologi − Forbedret driftseffektuvitet − Verdiskaping − Nyskapende, kreativ, proaktiv − Vilje til å dele idéer

24 24 BPs prinsipper for innkjøp 1.Forholder oss til norsk lov (EU Procurement Directive) 2.Bruker Achilles leverandørsystem (www.achilles.no)www.achilles.no 3.Foretar pre-kvalifisering når det er nødvendig 4.Opptatt av å utvikle lokal industri til å komme i posisjon 5.Arbeider etter strenge etiske regler - ”BP’s Code of Conduct” 6.Evalueringen foretas etter pre-definerte retningslinjer 7.Evalueringskriterier vil være individuelt tilpasset hvert anbud og vil fokusere på levetidskost, helse-miljø-sikkerhet, kvalitet, referanser, effektivitet etc.