Presentasjon lastes. Vennligst vent

Presentasjon lastes. Vennligst vent

Ediel Presentasjon av Ediels Change of Supplier (CoS) prosjekt Ove Nesvik SFG / NEEG møte 4. februar 2002.

Liknende presentasjoner


Presentasjon om: "Ediel Presentasjon av Ediels Change of Supplier (CoS) prosjekt Ove Nesvik SFG / NEEG møte 4. februar 2002."— Utskrift av presentasjonen:

1 Ediel Presentasjon av Ediels Change of Supplier (CoS) prosjekt Ove Nesvik e-mail: ove.nesvik@edisys.no SFG / NEEG møte 4. februar 2002

2 www.edisys.no Ediel Ediel modell The vision of the project is to produce a model of the electricity power market to:  Provide a basis for facilitation and harmonisation in planning, trade, settlement and other processes important for the electricity power market.  Provide a basis for a common way of exchanging information in the electricity power market.  To make the models based on international accepted standards, so that the result can be understood and used by as many as possible.  To make the deregulated electricity power market understandable for the participating parties.

3 www.edisys.no Ediel CoS - Deltagere Diego García, HEW (D), Chairman Eric Roca, RTE (F) Henk Schoenmakers, Electrabel (BE) Joachim Schlegel, RWE (D) Kees Sparreboom, TenneT (NL) Lars-Erik Löf, Dalakraft (S) Leif Morland, SchlumbergerSema (N) Lisbeth Sejersen, NESA (DK) Oscar Ludwigs, SvK (S) Ove Nesvik, EdiSys (N), Secretary Roy Simensen, Lyse (N)

4 www.edisys.no Ediel CoS - Status FinlandPRODAT NorgePRODAT SverigePRODAT TysklandUTILMD NederlandUTILMD fra 1/1 2002 BelgiaUTILMD fra 1/1 2003 DanmarkUTILMD fra 1/1 2003 Frankrike?

5 www.edisys.no Ediel CoS Fase 1 - Resultater  En modell (dokument) som beskriver CoS prosessen i deltagerlandene  En Implementation Guide som dekker leverandørbytte iformasjon i Danmark, Tyskland og Nederland

6 www.edisys.no Ediel CoS Fase II  Flytting (inn og ut)  Fakturering  ”Master data” (målepunkter, målere, parter, fakturering)  Opprettelse og avslutning av målepunkter  Konkurs  Bytte til ”leverandør av siste instans”

7 www.edisys.no Ediel CoS modell

8 www.edisys.no Ediel Change balance supplier

9 www.edisys.no Ediel Metering point administrator Metered data collector Balance supplier Consume r Old New Contract and Optional authorisation 2: 16:E11 Metered data, meter stands (Change of supplier) 15: E11 Metered data, meter stands (Validity check) (BE) 14: E14 Request for action regarding metered data (Validity check) (BE) 13: Meter reading 12: Information regarding start of supply (DE) 11: 406 Information or confirmation of end of supply (Change of Supplier) 10: 414 Confirmation of start of supply (Change of Supplier) 9: E11 Metered data, meter stands (Validity check) (BE) 8: E14 Request for action regarding metered data (Validity check) (BE) 7: 392 Notification to Metering point administrator of start of supply (Change of Supplier) 6: Information on contract closure (DE) 5: E01 Acknowledge termination (DE) 4: E01 Contract termination (DE) 3: Contractual offer 1: In addition to the arrows shown: - In the Netherlands and in Belgium the Metering point administrator will send an update message to the old and the new Balance responsible party - In Germany the Balance responsible party will be informed of changes inside his portefolio from his Balance suppliers Blue text will not be further detailed. Normally not implemented as e.messages May include master data for the metering point May include a meter reading Only for profiled settled metering points Only if a meter reading is received from the Customer and this is to be verified.

10 www.edisys.no Ediel Customer move

11 www.edisys.no Ediel Customer move out

12 www.edisys.no Ediel Customer move in

13 www.edisys.no Ediel Change of customer

14 www.edisys.no Ediel Combined customer move

15 www.edisys.no Ediel Exchange master data

16 www.edisys.no Ediel Billing

17 www.edisys.no Ediel Billing

18 www.edisys.no Ediel SG. 4 O99999 IDE M1 RFF M1 SG. 8 O99 QTY M1 DTM O9 SG. 7 O99 SEQ M1 LOC O9 SG. 6 O99 CCI M1 CAV O99 DTM O9 STS O9 TAX O9 PTY O9 FTX O9 PIA O9 STS O9 SG. 9 O99 CCI M1 CAV O99 AGR O9 INP O9 SG. 5 O99 UTILMD Transaction id. Metering point Grid area Register Meter time frame

19 www.edisys.no Ediel CoS - Evaluering  Både modellen og IG‘en vil være en basis for nasjonale brukerveiledninger  Resultatet dekker flere varianter enn opprinnelig ønsket  Modellen har minere detaljeringsgrad enn UMM beskriver  CoS prosessen er mer komplisert enn andre prosesser innefor kraftbransjen  Viktig med arbeid mellom møtene


Laste ned ppt "Ediel Presentasjon av Ediels Change of Supplier (CoS) prosjekt Ove Nesvik SFG / NEEG møte 4. februar 2002."

Liknende presentasjoner


Annonser fra Google